Saturday, June 2, 2012
Hard Work
Our second day in Vietnam was met with some sleepy faces after some
decided Karoke was in order last night. Breakfast was like the day before,
friends anticipating the busy day ahead.
It was a boring ride to the build site and a light drizzle of rain began.
Of course we had to work despite the conditions, but it ended just as we
began to work, and we were split back into our original posts for first
few minutes.
As we switched between the jobs, most have moved to the un-finished house
which needed digging to prepare to fill foundations. I switched between
having to create metal supports for the concrete to set and hammering
metal bars, to digging non-stop.
The majority of people were assisting in digging the trenches of the
undemolished house, in which the sun was blazing down on us and forcing us
to take constant breaks, while many of us tried to brave the heat and do
much more before stopping. - Tharon